Download article «Commissioning of a 10 MLD WWTP with flat sheet MBR technology The Arenales del Sol case»

Abstract
Many WWTPs fitted with MBR technology have experienced severe difficulties during the commissioning and start up phases of the Project, specifically because operational problems are normally manifested as failure to meet the hydraulic load, rather than achieve the required level of purification.
Seguir leyendo